Contractors General Rules and Regulations Insurance Protection Moving Procedures Smoking
Moving Procedures
Page: 2 of 8 Back  |  Next

Moving Procedures (Continued)

  1. Procedures
    • It is absolutely necessary that you notify the Management Office, in writing, and receive approval at least two weeks in advance of your intended move.
    • Moves will be scheduled on a first come, first served basis.  Two moves may not occur simultaneously.
    • Moves are restricted to anytime after 2:00 p.m. Monday through Friday.
    • Only the freight elevator may be used for moving furniture and equipment.
    • There is to be no moving through the main lobbies of the building.  All moves must go through the loading area on the West side of the building.
    • Any attempted moves, without prior approval of the Management Office, will be stopped.
  1. Clean-Up

Moving or delivery companies and the tenant will be responsible for leaving the building and premises clean by removing all cartons and other trash generated in the move.  This material may not be placed in the building dumpster or left at the loading dock.  If you desire help in the clean up, personnel can be provided on a time and material basis.  This service may be prearranged through the Management Office.

Powered by ETS. ©2026 All rights reserved. | |